TIPS OF OPERATION

发布人/来源:jingbao    发表日期:2009/7/8

Step1: Run the ventilation system in the construction locate, Open doors and windows to ventilate the place.

Step2: Before construction, check the lance and let away the seeper in the pressure pipe.

Step3: Make the surface of the material cleam, without grease, dust or impurity.

Step4: Muzzle spray averagely

Step5: After even spray, lay it for 1-5 min to agglutinate it.(Or when the coating is not sticky)

Step6: Better to place some pressure when conglutination is done.

Linear style:muzzle form45° angle, Better to keep a distance of 0.5m between the muzzle and the surface Of the material, The air-          pressure of the lance should be adjusted to 6-8 kgs accordingly.

Sector style: plumb up the muzzle with the surface of the material to spray even sector gel fog whose angle is approximately45°.


关闭窗口