TIPS OF OPERATION |
||
Step1: Run the ventilation system in the construction locate, Open doors and windows to ventilate the place. Step2: Before construction, check the lance and let away the seeper in the pressure pipe. Step3: Make the surface of the material cleam, without grease, dust or impurity. Step4: Muzzle spray averagely Step5: After even spray, lay it for 1-5 min to agglutinate it.(Or when the coating is not sticky) Step6: Better to place some pressure when conglutination is done. |
||
【关闭窗口】 |